Colorado University Athletics
Basketball/Volleyball Practice Facility Fun Facts
2900 Linear Feet of drilled pier foundation
7000 Square Feet sandstone veneer
12,000 Square Feet precast concrete exterior wall panels
19,600 Square Feet flat roof area
8,000 Square Feet clay tile roof area
1 elevator
14,300 Cubic Yards mass excavation
19,000 Square Feet wood sports floor
Each new gym will accommodate (all with substantial run-out area)
- 1 full BB court or
- 4 half BB courts 0r
- Â 6 3-on-3 BB shooting areas or
- 1 VB court lengthwise or
- 2 VB courts crosswise
63,000 lbs of mechanical ductwork
Plumbing
- 4 new showers
- 5 new drinking fountains
- 11 new toilets
- 1 new urinal
- 4600 Linear Feet piping
Approx. 380 new interior light fixtures
- Includes 40 new fixture per gym
The building was given LEED Platinum Certification, the highest possible by the internationally recognized system developed by the US Green Building Council. To date, 557 buildings in the world have achieved it, 473 in the US.Â
Of the 473 in the US, only 31 other buildings in all of higher education nationwide have met the standard, and this is the second athletic facility besides Florida's west stadium expansion.Â
Campus has 14 buildings recognized by the LEED standard with only three on the platinum level, the others are the Systems Biotechnology and Williams Village buildings.Â
It's 43,000 square feet
Each gym is 11,000 square feet
Both practice courts mimmick the playing surface in Coors exactly, down to the lines and logos.Â